Program Name Program Purpose
Program Price (USD) Spin plan Improving quality and increasing
production from card to ring 2500 Comber data Improving comber yarn quality and
reducing blowroom waste and combing noil percentage
2 500 Card fibre Improving yarn evenness and reducing
carding waste with Laplace transfer functions
2 300 Prdn10 * Increase production and efficiency level
in ring and rotor spinning
10 000 Qcrs10 * Quality / process data control for ring
and rotor spinning
10 000 Fibremix Optimum blend selection and improving
yarn quality
2 875 Spinning mill data bank ver 1.0**
Improving quality and efficiency through
textile technology and spectrogram analysis 2 000 Spinning mill data bank ver 2.0 **
Improving quality and efficiency through
textile technology and spectrogram analysis
3 000 Spinning performance Improving labour performance and
efficiency in ring spinning
2 500 Spinning geometry Improving production level in ring
spinning
2 500 Spin matrix Matrix Analysis in millworks 2 000 Yarn RKM Improving yarn strength and evenness
2 000 Yield Performance
Yield performance control and analysis
4 500 Standard cost
Standard cost analysis
14 500 Manufacturing costs
Manufacturing cost analysis
25 000 Time studies spinning
Increasing productivity in spinning
4 500 Qcc* Motivation and organisation of quality
control circles
2 000 Process/quality Control*
Process /quality control tests and
producers of spinning
5 000
*
These programs are free of charge if only Knowledge Based Quality Management is established.
**The price is for each machine type in the processing line
***The prices don't contain VAT (Value Added Tax)