MILL PERFORMANCE REPORT FOR WEAVING MILLS

 

 

Outline of Mill Performance Report

A summary for Mill Performance Report is given below. The following items are checked and necessary suggestion are given to mill management to reduce manufacturing costs and improve quality levels. Before visiting your mill the customer should fill the Machinery and Processing Data Form and submit to us .

MILL PERFORMANCE SUMMARY FOR WEAVING MILLS BY ITRU GROUP Ltd - MPRT-W1

 

 

Item #

 

Description

 

1

 

Machinery and Processing Data

 

2

 

Mill Balance

 

3

 

Production Summary

 

4

 

Productivity

 

4.1

 

Machine Utilisation

 

4.2

 

Productivity and Loom Efficiency

 

5

 

Fabric Setting and Instruction Report

 

6

 

Weaver Report

 

7

 

Styles Report

 

8

 

OPH Analyses

 

9

 

Mill Organisation

 

10

 

Preventive Maintenance

 

11

 

Machine Check Lists

 

12

 

Statistical Process Control Procedures

 

13

 

Measuring and Control for Machine Checks

 

14

 

Mechanical Breakdowns / Fixer Interruption Analyses

 

15

 

Spare Parts Consumption Control

 

16

 

Machine Tests

 

17

 

Stoppages and Their causes

 

18

 

Knowledge Based Problem Analyses / Problem Solving

 

19

 

Air Conditioning

 

20

 

Floor Finishes

 

21

 

Cleaning and Lighting Procedures

 

22

 

Transport Systems Used and Automation Possibilities

 

23

 

Standard Cost Calculations ( Optional )

 

24

 

Savings as a Result of Mill Performance Reports

 

25

 

Summary and Recommendations

 

26

 

Proposal of Engineering Work for Process Optimisation and Knowledge Based Management

Business plan for any work we carry out should be planned before we take actual action.

  1. Mill performance report for your weaving mills that could be done for all your mills. This would also give an idea about which mill we could start     from . In any case mill performance report will assist all the mills to reduce manufacturing costs to some extend .
  2. Mill work

After visiting and preparing reports about your mills . We could give exact figures about