MILL PERFORMANCE REPORT FOR WEAVING MILLS
![]()
Outline of Mill Performance Report
A summary for Mill Performance Report is given below. The following items are checked and necessary suggestion are given to mill management to reduce manufacturing costs and improve quality levels. Before visiting your mill the customer should fill the Machinery and Processing Data Form and submit to us .
MILL PERFORMANCE SUMMARY FOR WEAVING MILLS BY ITRU GROUP Ltd - MPRT-W1
|
Item # |
|
Description |
|
1 |
|
Machinery and Processing Data |
|
2 |
|
Mill Balance |
|
3 |
|
Production Summary |
|
4 |
|
Productivity |
|
4.1 |
|
Machine Utilisation |
|
4.2 |
|
Productivity and Loom Efficiency |
|
5 |
|
Fabric Setting and Instruction Report |
|
6 |
|
Weaver Report |
|
7 |
|
Styles Report |
|
8 |
|
OPH Analyses |
|
9 |
|
Mill Organisation |
|
10 |
|
Preventive Maintenance |
|
11 |
|
Machine Check Lists |
|
12 |
|
Statistical Process Control Procedures |
|
13 |
|
Measuring and Control for Machine Checks |
|
14 |
|
Mechanical Breakdowns / Fixer Interruption Analyses |
|
15 |
|
Spare Parts Consumption Control |
|
16 |
|
Machine Tests |
|
17 |
|
Stoppages and Their causes |
|
18 |
|
Knowledge Based Problem Analyses / Problem Solving |
|
19 |
|
Air Conditioning |
|
20 |
|
Floor Finishes |
|
21 |
|
Cleaning and Lighting Procedures |
|
22 |
|
Transport Systems Used and Automation Possibilities |
|
23 |
|
Standard Cost Calculations ( Optional ) |
|
24 |
|
Savings as a Result of Mill Performance Reports |
|
25 |
|
Summary and Recommendations |
|
26 |
|
Proposal of Engineering Work for Process Optimisation and Knowledge Based Management |
Business plan for any work we carry out should be planned before we take actual action.
After visiting and preparing reports about your mills . We could give exact figures about
from ....... to ........ that we can achieve together. For mill work we would wish to start working in 3 shifts Per day running mill. When we have actually achieved significant improvement in mill performance level then we can commence next mill. We put emphasise on following points: